CORPORATE PROJECT
The implementation of the technology is simple, fast and uncomplicated. Everything happens in 03 steps, without one for the contracting party.
TECHNICAL STUDY
Our engineering department will carry out a free technical consultation to diagnose the particularities of the company's energy consumption to size and quantify the technology installation models and locations.
TECHNICAL PROPOSAL
After carrying out the project performance studies, a technical feasibility report will be presented, containing the following information:
-
Location, model and quantity will be implemented in the CCM/QGBT of the plant;
-
Payback simulation according to the client's needs;
-
Carbon bonding studies TonCO2eq, which will stop being emitted avoiding the emission of Stove Exhaust Gases (GEE).
TELEMETRY
The corporate verification telemetry is carried out following all the parameters of the PIMVP protocol (International Measurement and Performance Verification Protocol) EFFICIENCY VALUATION ORGANIZATION according to the example below.
TO PLANILHA TELEMETRY BELOW DEMONSTRA IN REAL TIME A REDUCTION OF THE ACTIVE POWER BY 17%.
TECHNICAL REPORT OF ENERGY CONSUMPTION AVALIAÇÃO
After the measurements and verifications (M&V) a technical report will be presented with graphs of the energy telemetry carried out with the respective economic verification results.
ECONOMY GRAPHICS
POWER AND CONSUMPTION REDUCTION GRAPH
THREE-PHASE INDUSTRIAL MODELS
PL05/160A
PL10/1060A
PL UNIPOWER / 6000A
Operating Voltage – 127/220V – 220/380V – 440V – 630V – 50/60Hz
Protection Fuse: 3A. Anti Raio em 6 KA per module
Ligação Type: Parallel – R.S.T – N/T.
The POUPALUZ ECOSMART SRC® System must be protected from rain, humidity and direct sunlight in its installation location and can be carried out for external installation as long as it is placed within the control panel for its protection and must not be exposed to excessive heat above 85ºC.